With SECI, Azure Power secures the first 150 MW ISTS wind-solar power project
Deprecated: preg_match_all(): Passing null to parameter #2 ($subject) of type string is deprecated in /home/www/energynews/wp-content/plugins/one-user-avatar/includes/class-wp-user-avatar-functions.php on line 1025
Deprecated: preg_split(): Passing null to parameter #2 ($subject) of type string is deprecated in /home/www/energynews/wp-includes/formatting.php on line 3492
Azure Power has obtained a letter of award from Solar Energy Corporation of India (SECI) for its first 150 MW ISTS linked wind–solar hybrid power project, which will deliver power for 25 years at a fixed rate of Rs. 2.35…